ESCO has successfully completed the restoration of Electrical Termination drawings between HVAC Control Panels and Condensing Unit Panels, along with the associated Cable Scheduling documentation. This work ensures improved accuracy, traceability, and reliability of HVAC electrical interfacing across multiple facility buildings.
The scope covered both PSG1 and PSG2 installations, including control, utility, and support buildings.
PSG1 Scope Completion
The following buildings under PSG1 were successfully reviewed and completed:
B22A-HCP77100: Control Building — Completed
B22A-HCP77200: Gate House Building — Completed
B22A-HCP77300: Substation Building — Completed
B22A-HCP77400: Warehouse — Completed
B22A-HCP77600: Accommodation Building — Completed
PSG2 Scope Completion
The same scope of work was successfully executed for PSG2:
B22B-HCP77100: Control Building — Completed
B22B-HCP77200: Gate House Building — Completed
B22B-HCP77300: Substation Building — Completed
B22B-HCP77400: Warehouse — Completed
B22B-HCP77600: Accommodation Building — Completed
Project Outcome
All applicable HVAC termination drawings and cable schedules were systematically reviewed, corrected, and restored to align with project requirements. The completion of this scope enhances installation clarity, reduces commissioning risks, and supports efficient maintenance and future system upgrades.