Project

Electrical Termination Drawings Restoration project – HVAC Systems (PSG1 & PSG2)

ESCO has successfully completed the maintenance of 7 Dry Type Power Transformers and 18 MV Cubicles (SM6-36), ensuring the safe and reliable operation of the electrical distribution system.

Completion

2026

Location

Georgia

Client

AZFEN

Category

HVAC Systems

Project

Electrical Termination Drawings Restoration project – HVAC Systems (PSG1 & PSG2)

ESCO has successfully completed the maintenance of 7 Dry Type Power Transformers and 18 MV Cubicles (SM6-36), ensuring the safe and reliable operation of the electrical distribution system.

ESCO has successfully completed the maintenance of 7 Dry Type Power Transformers and 18 MV Cubicles (SM6-36), ensuring the safe and reliable operation of the electrical distribution system.

Completion

2026

Location

Georgia

Client

AZFEN

Category

HVAC SYSTEMS

About the project

About the project

ESCO has successfully completed the restoration of Electrical Termination drawings between HVAC Control Panels and Condensing Unit Panels, along with the associated Cable Scheduling documentation. This work ensures improved accuracy, traceability, and reliability of HVAC electrical interfacing across multiple facility buildings.

The scope covered both PSG1 and PSG2 installations, including control, utility, and support buildings.

PSG1 Scope Completion

The following buildings under PSG1 were successfully reviewed and completed:

  • B22A-HCP77100: Control Building — Completed

  • B22A-HCP77200: Gate House Building — Completed

  • B22A-HCP77300: Substation Building — Completed

  • B22A-HCP77400: Warehouse — Completed

  • B22A-HCP77600: Accommodation Building — Completed

PSG2 Scope Completion

The same scope of work was successfully executed for PSG2:

  • B22B-HCP77100: Control Building — Completed

  • B22B-HCP77200: Gate House Building — Completed

  • B22B-HCP77300: Substation Building — Completed

  • B22B-HCP77400: Warehouse — Completed

  • B22B-HCP77600: Accommodation Building — Completed

Project Outcome

All applicable HVAC termination drawings and cable schedules were systematically reviewed, corrected, and restored to align with project requirements. The completion of this scope enhances installation clarity, reduces commissioning risks, and supports efficient maintenance and future system upgrades.

Photos

Photos

ESCO

Navigation

Navigation

About

About

Solutions

Solutions

Projects

Projects

Certificates

Certificates

Career

Career

Contact us

Contact us

Chinar Plaza, Floor 20, 152 H.Aliyev avenue, AZ1029, Baku, Azerbaijan

Chinar Plaza, Floor 20, 152 H.Aliyev avenue, AZ1029, Baku, Azerbaijan

+994774140077

+994774140077

sales@escoaz.com

sales@escoaz.com

9.00 AM – 06.00 PM

9.00 AM – 06.00 PM

@2026 ESCO Group. Industrial Precision & Automation.

@2026 ESCO Group. Industrial Precision & Automation.