Project

7 Dry Type Power Transformers and 18 MV Cubicles (SM6-36) Maintenance

ESCO has successfully completed the restoration of Electrical Termination drawings between HVAC Control Panels and Condensing Unit Panels, along with the associated Cable Scheduling documentation.

Completion

2026

Location

Georgia

Client

AZFEN

Category

HVAC Systems

Project

7 Dry Type Power Transformers and 18 MV Cubicles (SM6-36) Maintenance

ESCO has successfully completed the restoration of Electrical Termination drawings between HVAC Control Panels and Condensing Unit Panels, along with the associated Cable Scheduling documentation.

ESCO has successfully completed the restoration of Electrical Termination drawings between HVAC Control Panels and Condensing Unit Panels, along with the associated Cable Scheduling documentation.

Completion

2026

Location

Azerbaijan

Client

Central Bank of of Azerbaijan

Category

Maintenance

About the project

About the project

Transformers and 18 Medium Voltage (MV) Cubicles (SM6-36). The maintenance scope was

carried out to ensure the continued safety, reliability, and operational performance of the electrical distribution systems. The works included detailed inspection, functional testing, cleaning, lubrication, grounding

continuity checks, and verification of critical electrical and mechanical components.

Dry Type Power Transformers

 The maintenance activities for the 7 Dry Type Power Transformers included:

 Physical and mechanical inspection

 Transformer room condition checks

 Thermistor and cooling fan testing

 Grounding continuity verification

 OLTC self-protection testing, where applicable

 General cleaning and maintenance reporting

MV Cubicles – SM6-36

 The maintenance activities for the 18 MV Cubicles included:

 Cleaning and inspection of breaker compartments

 Grounding continuity checks

 Inspection of indicators, heaters, and measuring devices

 Testing of grounding disconnectors and interlocking systems

 Lubrication and inspection of mechanical components

 Inspection and torque verification of MV cable and busbar connections

 Breaker, contact, coil, and spring charging motor testing

 Contact transition resistance measurement

 Inspection of epoxy insulation and cubicle components


Project Outcome

Through the completion of the maintenance program, 7 Dry Type Power Transformers and 18

MV Cubicles (SM6-36) were systematically inspected, cleaned, tested, and serviced.

The completed maintenance activities enhance the reliability, safety, and operational

readiness of the electrical distribution infrastructure, while supporting preventive maintenance

requirements and reducing the risk of unexpected equipment failures and operational

interruptions.

Photos

Photos

ESCO

Navigation

Navigation

About

About

Solutions

Solutions

Projects

Projects

Certificates

Certificates

Career

Career

Contact us

Contact us

Chinar Plaza, Floor 20, 152 H.Aliyev avenue, AZ1029, Baku, Azerbaijan

Chinar Plaza, Floor 20, 152 H.Aliyev avenue, AZ1029, Baku, Azerbaijan

+994774140077

+994774140077

sales@escoaz.com

sales@escoaz.com

9.00 AM – 06.00 PM

9.00 AM – 06.00 PM

@2026 ESCO Group. Industrial Precision & Automation.

@2026 ESCO Group. Industrial Precision & Automation.